Extending an existing material to a new plant or sales organisation required a specialist, a checklist and four days. The checklist lived in a shared drive, the specialist was a single point of failure, and the fields that mattered varied by material type in ways that were understood but never written down.
As the network grew, the maintenance backlog grew with it, and operations teams began creating local workarounds rather than waiting for the extension to complete.